Hille, Thompson & Delfos have been involved in many projects, including:

WAITSIA GAS PROJECT - DONGARA

  • Route Surveys
  • Set out during construction.
  • Ascon survey
  • Easement & RoW Plans
ABRAHAM ST BRIDGE - GERALDTON
  • Setout during all construction
  • Complete Verita/Abraham St construction phase in the previous year
MINERAL STOCKPILES
  • Principal Surveyors during construction and upgrade programs of Processing Plant Developments through out the Midwest.
  • Stockpile Volume Surveys. In this case using our UAV
Copy
IRON ORE - DUAL WAGON TIPPER - Geraldton Port
  • Dimensional Control during assembly
  • Automatic Monitoring of structural subsidence during construction and dewatering of vault.

 

MAIN ROADS

  • Various new alignment and upgrade projects on
    • Great Northern Highway
    • Geraldton - Mt Magnet Road
    • Brand Highway
  • Alignment and upgrade of North West Coastal Highway - Binnu
  • Construction of bridges at Goodman Creek on NWCH
  • Surveys on numerous roads in Midwest for Local Govt's.
  • White Line Spotting & Barrier Marking
 
MINERAL EXPLORATION 
  • Gridding,
  • Tenement Pegging,
  • Drill Hole Coordination,
  • Preliminary Mine Plan Survey,
  • Open Pit Volume Surveys,
  • Petroleum Well coordination.
  • Tenement Surveys
SUBDIVISIONS
  • Metropolitan and Rural Subdivisions from Kalbarri to Greenhead and Meekatharra to Moora.
  • Involved with initial design of subdivisions, the setting out of internal roads, sewers and drainage to final pegging and early lodgement of Deposited Plans to enable the preparation of titles.
WIND & SOLAR FARMS & POWER TRANSMISSION LINES
  • Various Route Surveys and Tower Marking on Lines in the Midwest and Wheatbelt.
  • Setout of the 54 Alinta (Walkaway) and the 48 Emu Downs (Cervantes) Wind Turbines
  • Setout 9000 pins for solar panel supports at the Greenough River Solar Farm Stage 1